Tubli Sewerage Scheme, Block 701

CLIENT
Ministry Of Works – Sanitary Engineering
COST
BD 1,123,157/-
TIMELINE
16 Months
SCOPE OF WORK
Laying of sewer pipelines, main line for a length of over 4.3 kms, UPVC &
GRP from dia 150 mm to 400 mm for depths up to 8.0 m, laterals for a
length of over 5.1kms, upvc from dia 100 mm & 150 mm. construction of
manholes more than 275 nos of type e,f,h. lift station 2 nos for depth of
9.0 m including M&E works stop board chamber, discharge chamber
and all associated works. replacement of waterlines ac to di. Asphalt
works