Proposed Hamala Sewerage Scheme Various Roads, Block 1010,Al Hamala Village
CLIENT
Ministry Of Works – Sanitary Engineering
COST
BD 2,250,711/-
TIMELINE
24 Months
SCOPE OF WORK
Laying of sewer pipelines, main line for a length of over 5 kms, UPVC & GRP
from dia 150 mm to 400 mm for depths up to 8.0 m, laterals for a length of
over 7.5 kms, UPVC from dia 100 mm & 150 mm. Construction of manholes
more than 700 nos of type e,f,h. Lift station 1 no for depth of 9.0 m including
M&E works stop board chamber, discharge chamber and all associated
works. Replacement of waterlines ac to di. Asphalt works